Re: English Teamwork 2 planning and discussion
Verfasst: Dienstag 1. August 2023, 13:20
A new version has been uploaded: 25 - find it in Google Drive, the link is in the first message
With this update, Montspoor has gotten a 3rd dimension: Height! The mountains west of Coates are now marked in the layout together with the old mainline Coates - Redbanks over the mountains. The line from Redbanks to Strone is now finalized. Part double track, part single track, with a bypass tunnel that cuts off ten minutes of travel time. Intermediate stations have appeared and will receive service soon.
IC5 has been timed to fit wirh IR11 from Cairndow and IR18 to Cairndow. Would you be able to swap one of them out on this leg to make it the same line in both directions? I think that would be for the best.
Unfortunately, the timings of IC5 in Redbanks doesn't allow for a perfect fit right now, unless I give it 30 minutes of waiting time in one of the directions.
With this update, Montspoor has gotten a 3rd dimension: Height! The mountains west of Coates are now marked in the layout together with the old mainline Coates - Redbanks over the mountains. The line from Redbanks to Strone is now finalized. Part double track, part single track, with a bypass tunnel that cuts off ten minutes of travel time. Intermediate stations have appeared and will receive service soon.
IC5 has been timed to fit wirh IR11 from Cairndow and IR18 to Cairndow. Would you be able to swap one of them out on this leg to make it the same line in both directions? I think that would be for the best.
Unfortunately, the timings of IC5 in Redbanks doesn't allow for a perfect fit right now, unless I give it 30 minutes of waiting time in one of the directions.
I think that will be the best solution, since my IC5 already connects the coastal towns every hour. In that case - since 97% of the route is in your area - we will simply use your trainsets with no additional Montspoor units.Sascha Claus hat geschrieben: ↑Samstag 29. Juli 2023, 21:46 G’d morning,
[...]
Threading IC22 through Cairndow and out to Strone will be a challenge, maybe we can sacrifice some freight train slots for that. Or the go via the new, electrified line for the fast IC, this also solves the electrification problem.
Ok, I will extend M19 - can we call it R19 though? The timetable is ready, expect it to be implemented next time.Sascha Claus hat geschrieben: ↑Samstag 29. Juli 2023, 21:46Note that SC-R19 (with the orange train) is missing all the connections in Cairndow when coming from Strone, but it has wonderful connections from Cairndow to the southwest. M-R19 (with the blue-and-white train) has great connections from Cairndow to northeast and is the one supposed to continue to Redbanks.I'll fit in an hourly service from you extending R19, unless you want me to use another route. During rush hour I will extend an additional hourly service forming half-hourly service. (For now with change of carriage at the border, just like IC12).
And the rolling stock and route number can be replaced by something of your choice.
Since the timings are already final I will extend them at some point. There are some marshalling yards on the way to Coates via the coastal route. What is the maximum length of freight trains across the border at Strone?Sascha Claus hat geschrieben: ↑Samstag 29. Juli 2023, 21:46 [Freight trains are] currently alternating between a container block train and a ‘mixed bag’ goods train from the soon-to-be-built marshalling yard. That might need some variation, such as trains from the harbours in Inverfyne (the town) and the smaller coastal towns, motorail trains, open access goods trains …