Overtaking of delayed trains

This area is dedicated to our foreign guests of this forum. Contributions can be written in any language.
[Diese Kategorie ist den ausländischen Gästen dieses Forums gewidmet. Beiträge können in beliebiger Sprache verfasst werden.]
Antworten
Pablo
Beiträge: 26
Registriert: Dienstag 8. März 2011, 10:07

Overtaking of delayed trains

Beitrag von Pablo »

Hello,
Is possible to made a overtaking of delayed trains as shown in the picture?
Bild
If {type of train is Express} and {late more e.g. 10 min.} and {signal S1 blocked} (by earlier train) then route applies IT-2.
else
route applies IT-1.
No problem to do it, but if train delayed always valid IT-2. I can't addict itenaries IT-1 with S1 because not possible to get requirement (late>1:10 and s=!.... ).
Bild
There is a solution?
Best Regards
Seb144
Beiträge: 463
Registriert: Freitag 23. Juni 2006, 13:31
Wohnort: Oranienburg
Kontaktdaten:

Re: Overtaking of delayed trains

Beitrag von Seb144 »

Pablo hat geschrieben:Hello,
Is possible to made a overtaking of delayed trains as shown in the picture?
Bild
If {type of train is Express} and {late more e.g. 10 min.} and {signal S1 blocked} (by earlier train) then route applies IT-2.
else
route applies IT-1.
No problem to do it, but if train delayed always valid IT-2. I can't addict itenaries IT-1 with S1 because not possible to get requirement (late>1:10 and s=!.... ).
Bild
There is a solution?
Best Regards
Hello Pablo,

yes there is. It's describe in the itenary tutorial (Fahrstraßentutorial), but the explanations are in German only. Please see http://www.das-bahn-forum.de/bahnforum/ ... 514#p65527.

Trains can overtake other trains (e. g. an express train can overtake a freight train), only this solution doesn't depend on delays.

The principle is basically as follows: If Train2 is on time there should be enough distance to Ex1 so it won't be overtaken, if Train2 is running just before Ex1 due to a delay it will be overtaken. So in your example applying the method described would require that you would have to list all express trains in a switch contact (e. g. EX1) and all trains that can be overtaken (e.g. Train2) have to be listed in another. Then you create the itenaries as decribed in the tutorial.

If you need an English version of that part of the tutorial this might take a little time.

Regards,


Sebastian
_________________
Berlin und Umgebung im Jahr 1989

http://www.bahn1989.berlin
Pablo
Beiträge: 26
Registriert: Dienstag 8. März 2011, 10:07

Re: Overtaking of delayed trains

Beitrag von Pablo »

Could you please give me little part sim where its working? Or where to look for it (in working sim). That should be enough for me to start with.
Thank a lot for helping.

Best Regards.
Seb144
Beiträge: 463
Registriert: Freitag 23. Juni 2006, 13:31
Wohnort: Oranienburg
Kontaktdaten:

Re: Overtaking of delayed trains

Beitrag von Seb144 »

Pablo hat geschrieben:Could you please give me little part sim where its working? Or where to look for it (in working sim). That should be enough for me to start with.
Thank a lot for helping.

Best Regards.
Hi Pablo,

just download the layout you find on the website http://www.bahn1989.berlin/Berlin_1989.htm and go to cursor postion 55.

Regards,


Sebastian
_________________
Berlin und Umgebung im Jahr 1989

http://www.bahn1989.berlin
Pablo
Beiträge: 26
Registriert: Dienstag 8. März 2011, 10:07

Re: Overtaking of delayed trains

Beitrag von Pablo »

Thanks. I found it.
By the way - can you tell me: which means "-" at timing point instead route?
Seb144
Beiträge: 463
Registriert: Freitag 23. Juni 2006, 13:31
Wohnort: Oranienburg
Kontaktdaten:

Re: Overtaking of delayed trains

Beitrag von Seb144 »

Pablo hat geschrieben:Thanks. I found it.
By the way - can you tell me: which means "-" at timing point instead route?
"-" and "--" are just routes with no trains assigned. I usually use them to seperate routes for different directions if a timing point, data changing point etc. works both directions to increase clarity.
Pablo
Beiträge: 26
Registriert: Dienstag 8. März 2011, 10:07

Re: Overtaking of delayed trains

Beitrag von Pablo »

Thank you very much for showing me the example. It wasn't easy, but it worked :)
Regards
Antworten